ZERO-EMISSION ALTERNATIVE TO DIESEL

5.5kW Industrial Mobile Power Station

True Off-Grid Power for Welding & Cutting

The Zero-Emission, Zero-Noise Alternative to Diesel Generators. Built for 5-8 years of heavy-duty construction, mining and rental fleet operations.

IP54 Rated for Outdoor Use: Waterproof & dustproof for -20°C to 60°C harsh sites

CATL LiFePO4 6000+ Cycles @80% DOD: 5x lifespan, 5-8 year asset life

True 5.5kW via CEE 32A Industrial Socket: Zero voltage drop for welding & cutting

Solar Powered Fast Recharge - 0-100% in 2.5H: Eliminate fuel costs

5-Year Warranty
48H Support
No Spam

with CATL LiFePO4 Battery

Power Anytime ,Power Anywhere!

One Jobsite ESS.

Built for Your Toughest Jobs.

Engineered as Construction Site Power Supply and Portable Industrial Power Supply

Outdoor Event

Construction Site Power

Renovation and Maintain

Emergency Rescue

WHY CATL • AUTOMOTIVE GRADE

Genuine CATL Inside. Not All Cells Are Equal.

CATL CELL ADVANTAGE

CATL LFP Cell

Standard Cells

6000+ Cycles life @80%DOD
Max 2000 Cycles Life

Capacity

93% after 5 years

Capacity

45% after 2 years

Lifespan

5-8 Years Asset

Lifespan

2-3 Years Only

Active Cell Balancing

Equalizes voltage, extends pack life

Multi-Point Temp Monitoring

No Spam

Low Thermal Risk

LiFePO4 chemistry, no fire propagation

5-8 Year Lifespan

Best TCO for rental fleets

Cycle Life

5X longer

Degradation

-60% Slower

Safety Rating

Automotive Grade
CATL World’s No.1 Battery Maker

Supplies Tesla, BMW, Mercedes. Same production line for ROVER.

Technical Specs: Portable Industrial Power Supply That Replaces Diesel

Genuine CATL Inside. Not All Cells Are Equal.

FEATURE

Continuous Output

Battery Cell

Protection

Industrial Outputs

Charging

Cycle Life

Certifications

SPECIFICATION

5.5kW Continuous (6.5kW Peak) Pure Sine Wave, THD <3%
Genuine CATL LiFePO4 Automotive Grade, 10kWh expandable to 15kWh
IP54 Waterproof & Dustproof, -20°C to 60°C Operating, Shock-Resistant Frame
1x CEE 32A 230V, 2x Schuko 16A, 2x USB-C PD 100W, 1x DC 12V / 25A, 1x Anderson 50A
AC Fast 3000W + Solar MPPT 5000W Max, 0-100% in 2H (AC), 2H Solar
6000+ @80% DOD / Warranty 5 Years Battery, 2 Years Inverter
CE, FCC, RoHS, UN38.3, MSDS, PSE (on request)

B2B ADVANTAGE

Runs 32A welding machines
6000+ Cycles, Lowest Risk
Outdoor use, no enclosure needed
EU industrial tools ready
Solar Powered Industrial Power Station China
Best TCO - 5-8 year asset
EU/US/AU customs ready, no delays

WHY CATL • AUTOMOTIVE GRADE

Based on 250 rental days/year @ €45/day average. Fuel cost €8000-12000 / year saved. Zero maintenance.

Diesel Generator 5.5kW

HIGH OPEX

Initial Cost

€2,500 - €4,000

Fuel Cost / Year

€8,000 - €12,000

Maintenance / Year

€800 - €1,500

Lifespan

3-4 Years (2,000h)

Noise / Emissions

85dB + CO₂

5-YEAR TOTAL COST

2000 Cycles life @80%DOD

€47,500 - €68,500

18-Month Full ROI For Rental Fleets

SENMEI ROVER CATL

BEST TCO

Initial Cost

€1,500 - €2,000

Fuel Cost / Year

€0

Maintenance / Year

€10 - €100

Lifespan

5-8 Years (6,000h)

Noise / Emissions

<65dB + CO₂

5-YEAR TOTAL COST

6000+ Cycles life @80%DOD

€6,900 Factory Price

Break-even 18 months

Rental companies earn €11,250/year per unit

after month 18. At 6000+ cycles, total profit €45k+ over 5 years vs diesel loss.

Certified For EU/US/AU Customs - No Delays

CE

EU Conformity

UN38.3

Transport Safe

MSDS

Material Safety

SEA Transport

Transport Safe Conformity

We Are The Source, Not a Trader

Factory-Direct Pricing: Save 30-40% vs local distributors. Tiered pricing from 10 units.

OEM/ODM Ready: Custom logo, color, packaging. MOQ 20 units. 7-day sample.

Stock & Fast Delivery: 100+ units in warehouse (china). 35-45 days sea, 3-5 days air.

EU WAREHOUSE: POLAND • US: LA • FACTORY: SHENZHEN

35-45 Days Sea Freight • 3-5 Days Air • DDP Available

Real-World Applications

Trusted by European Construction, Welding, and Event Professionals

Get a Quote

You Get More Than a Power Station.
5-Year Warranty, 2-Year Inverter

Battery 6000+ cycles guarantee, inverter replacement in 48h

48-Hour Technical Response

Video support, wiring diagrams, EU spare parts stock

Video Factory Audit Available

Live 4K walkthrough of CATL line + QC lab. Book in 24h.

Trade Assurance Accepted

Alibaba Trade Assurance, TT, L/C. Secure payment for B2B

Michael Zhuo, B2B Manager

8 Years in Industrial Power • Speaks EN/CN

Scroll to Top

Let's Talk About The Best Battery Solutions

Tell us your needs and get a quick reply, one of our engineers will assist you.